Streets for People Working Group Site Visit – Worcester Park

Yesterday I met up with the Streets for People Working Group to assess the physical improvements that have been made near Worcester Park Station and Green Lane.

Some of the improvements included:

  • Removal of guard railing around Worcester Park Station- much needed
  • Improved street lighting – removal of orange lighting to white lighting – it now feels safer and there are less shadows
  • Improved paving – the area near Worcester Park station now has a lovely sandstone coloured paving, making the area feel brighter
  • Improved paving along desire line access to the station
  • Improved crossing access for pedestrians
  • New seating – increasing capacity and providing comfortable seating
  • Installation of trees – in years to come will provide shade, improve air quality and provide a relaxing element to the space

Overall the physical improvements have been a success, but some future improvements (subject to funding) such as a holistic town centre urban design treatment could include:

  • Removal of guard railing and consolidate signage- there is a lot!
  • Improved seating with backs and arm rests
  • Pedestrian level white street lighting where appropriate
  • A greening of the area, perhaps to include more trees, small planters with sustainable, maintenance free planting
  • Sandstone coloured paving – durable and easy to clean
  • More informal clutter free crossing points like the crossings in Kings road
  • Grants/loans made available to improve shop fronts

Please see my flickr page for further improvements which could be made in the local area.

 

 

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

Powered by WP Hashcash